For a facility to provide services at the required quality, it must meet initial requirements before entering operation. To ensure this, ENAIRE’s technical operations engineering staff prepare a joint acceptance protocol to verify that a facility meets the technical and functional requirements for which it was designed and is ready for technical operation as soon as the service starts.
The CNS (communications, navigation, and surveillance) services and those associated with ATS (air traffic services) systems are then configured, and a determination is made in terms of whether the facility’s performance meets expected standards.